2010
09.01
09.01
Denis Andrews was kind enough to send me some pictures of his recent accelerated bridge construction project over the Arrow River near Miniota, Manitoba.
It replaced this high abutment “Heritage” bridge.
The bridge is 16.5 meters long with a precast pretensioned voided slab deck. Denis said the project had a few hitches but overall it was a great success.
He thought it has the potential to be placed in a few more sites around the province. Denis thanks for the photos!
I worked on a similar structure here in the states. If you want to contact Denis for more information, let me know.
Similar Posts:
- Bubble Deck
- The Faux Namti Bridge
You might like to read.









